Joined: 26/6/2004 Silver Member
Forum Posts: 166
Site Reviews Total: | 3 |
|
Site Reviews 2024: | 0 |
Site Reviews 2023: | 0 |
Site Reviews 2022: | 0 |
Site Reviews 2021: | 0 |
Site Reviews 2020: | 0 |
Site Reviews 2019: | 0 |
Site Reviews 2018: | 0 |
|
Site Nights 2024: | 0 |
Site Nights 2023: | 0 |
Site Nights 2022: | 0 |
Site Nights 2021: | 0 |
Site Nights 2020: | 0 |
Site Nights 2019: | 0 |
Site Nights 2018: | 0 |
|
dont have a copy, but we used to leave the 2.5mtr awning attached to the main body, erect the first frame work at half mast,(legs not joined so roof is low) pull canvis over frame, attach next awning, erect first frame, build second frame low, pull over canvas and erect second frame, tension everything and peg it all down, worked well for us. good luck and enjoy
------------- garreth
|