Joined: 24/5/2004 Diamond Member
Forum Posts: 4634
Site Reviews Total: | 29 |
|
Site Reviews 2024: | 0 |
Site Reviews 2023: | 0 |
Site Reviews 2022: | 0 |
Site Reviews 2021: | 0 |
Site Reviews 2020: | 0 |
Site Reviews 2019: | 0 |
Site Reviews 2018: | 0 |
|
Site Nights 2024: | 0 |
Site Nights 2023: | 0 |
Site Nights 2022: | 0 |
Site Nights 2021: | 0 |
Site Nights 2020: | 0 |
Site Nights 2019: | 0 |
Site Nights 2018: | 0 |
|
You only need to check running gear/chassis,gas test,water and electrical test.
Hot water boiler if its has one and a very quick damp test.
Remember alko hub nuts are about £3 off ebay not £20 like some engineers charge,we dont charge for hub nuts unless its BPW.
Should take one man between 1-2 hrs.
|