Hi There - Another new one to the Camping fraternity :
Just got our Wynnster Cygnus 8 and put it up in the garden (tips from twotanks noted) - Fabulous tent - we are well pleased and need to kit ourselves out with some more bits and bobs before heading for a site - ANYWAY ---
When we went inside the ground sheet in a couple of areas is raised off the ground - (apparently about 3 to 4 inches on one bedroom entrance) It is where the entrance to the bedroom pods are - it worries me as the 'material frame of the zip door' is stitched to the groundsheet at this point and i dont want it to rip.
Is it just that we need to spend more time 'fiddling' befor pegging the inner tent out or could we have gone wrong somewhere.
It is a SIG tent pitched inner first - Thanks
|