Joined: 12/4/2004 Diamond Member
Forum Posts: 1722
Site Reviews Total: | 1 |
|
Site Reviews 2024: | 0 |
Site Reviews 2023: | 0 |
Site Reviews 2022: | 0 |
Site Reviews 2021: | 0 |
Site Reviews 2020: | 0 |
Site Reviews 2019: | 0 |
Site Reviews 2018: | 0 |
|
Site Nights 2024: | 0 |
Site Nights 2023: | 0 |
Site Nights 2022: | 0 |
Site Nights 2021: | 0 |
Site Nights 2020: | 0 |
Site Nights 2019: | 0 |
Site Nights 2018: | 0 |
|
The video does just show the central pod going up in a quick time. The side extensions and the pegging out is what will take longer.
The set up time for the central section is very similar to the Khyam quick erect system.
|