Joined: 24/6/2006 Diamond Member
Forum Posts: 3261
Site Reviews Total: | 0 |
|
Site Reviews 2024: | 0 |
Site Reviews 2023: | 0 |
Site Reviews 2022: | 0 |
Site Reviews 2021: | 0 |
Site Reviews 2020: | 0 |
Site Reviews 2019: | 0 |
Site Reviews 2018: | 0 |
|
Site Nights 2024: | 0 |
Site Nights 2023: | 0 |
Site Nights 2022: | 0 |
Site Nights 2021: | 0 |
Site Nights 2020: | 0 |
Site Nights 2019: | 0 |
Site Nights 2018: | 0 |
|
We were there at whitsun micky, the work on the old toiletblock by the slipway was well under way & the new block was due to open in 6 weeks from the time of our visit. I supose this means that by the middle of July at the latest there'll be a brand new toilet/shower block there.
The plan of it is across the road from the building & it looks lovely. To be honest, I'm trying to remember how any showers there are each side but I can't. The block is split into two sections, one planned to be open early season & the whole block for main season. Good idea for keeping the building safe from the idiots.
It's been a long time coming but it's really does look lke the dogs doodahs.
BB
|